Swimming Pool Opening?

We are now well pasted Memorial Day and our communal swimming pool is still not open. I have asked around and from what I found out work needs to be done before the pool can open. I assume that this must be the same work that I kept telling them about last year when I ran the pool. The townhouse association chose to ignore what I was saying then then gave me a hard time when I had to close the pool early.

Even though I hear they are going to open the pool after they have carried out repairs the fact of the matter is that this should have been done in March and April before the pool was due to be opened. Instead it is now June, the pool is supposed to be open and I am paying for a pool that is not open. Its a pity they did not listern to me last year, they might not be in this situation if they had listened to my concerns.